JSC "ENERGY SOLUTIONS"

executing complex EPC energy facilities construction projects

since 2011

We create modern efficient thermal and electrical energy sources for different industries.

 

 

Our solutions allow for:

-efficient use of secondary resources - primary production waste (technological steam and gases, liquid and solid waste) for power generation

-reducing costs of energy supply

-increasing reliability of energy supply

Новое фото УТЭЦ НЛМК 123.jpeg
 

SERVICES

JSC "Energy Solutions" provides services of general contractor of energy  facilities construction (ЕРС)   and construction management (ЕРСМ):

  • basic and detailed engineering design

  • full cycle of construction and installation works

  • main and auxiliary  power generating equipment and materials supply

  • start-up 

  • conducting pre-launch tests and benchmarking

  • commissioning

  • quality control at all execution stages

  • personnel training

  • warantee servicing

 
Монтаж_3.jpeg
DSC_6310.jpg

HOLLISTIC CONSTRUCTION MANAGEMENT 

 Energy Solutions provides detailed production and construction project planning as well as constant control subcontractors and sub-suppliers.

We utilize holistic approach to construction management using different approaches:

  • General Contractor — executing entire project for fixed price  and baring complete financial responsibility for project risks.

  • Construction management – managing entire construction project on customer's behalf.

ENGINEERING DESIGN

Energy Solutions posess own design center consisting of highly-qualified design engineers and  utilises  latest design technology BIM  (facility digital image).

BIM is an object-oriented digital model of both facility and  construction process allowing:

  • decrease of construction duration (from design to commissioning)

  • cut costs at all execution stages

  • minimise design mistakes (collisions)

  • visualise any project area with required detailization 

  • provide  possibility of facility change and upgrade during entire life-cycle 

3.jpeg
SERG0193.jpg

EQUIPMENT AND MATERIALS SUPPLY

Partnerships with foreign and local main and auxilliary  equipment allow our customers  to procure at lowest prices available.

Our experts provide full logistic support for equipment and materials supply

  • Main and auxiliary powergen equipment from Western and local manufacturers organisation of supply

  • Individual drafting and estimation  of transportation logistics schemes

  • Delivery to any location in Russia and the CIS countries including custom clearance

  • Equipment safekeeping at construction sites

START-UP AND COMMISSIONING WORKS

Energy Solutions possess adequate production and human resources with officially verified competences (Russian SRO member)  to execute start-up and commissioning works of any difficulty level in Russia and Mongolia.

Start-up and commissioning division consists of more than 80 qualified engineers and specialists possessing all required certification and licensing  (NAKS, Rostekhnadzor attestations etc) with extensive experience of projects completed in Russia and Mongolia.

%25D0%259C%25D0%25BE%25D0%25BD%25D1%2582%25D0%25B0%25D0%25B6_2_edited_edited.jpg

OUR MANAGEMENT TEAM

Employees are Energy Solutions' main asset. 

Key managers and engineers  have been employed for over 8 years on average.   

KONSTANTIN TOROPCHIN

General Director

SERGEY KOSTIN

Commercial Director

SERGEY STREBLICHENKO

Executive Director

DMITRI GONCHAROV

Design Director

IVAN ZAPOLSKI

Chief Engineer

VALERI PAVLIKOV

Sales Director

KONSTANTIN SAMOILOV

Business Development Director

EKATERINA BARDANOVA

Deputy General Director Finances

 

OUR ADVANTAGES

TEAM  RELATIONSHIPS    RESOURCES    EXPERIENCE    REPUTATION    TECHNOLOGIES   PRINCIPLES

Team is our main capital and best asset.

All employees are highly-qualified with extensive experience of large EPC projects executions.

 

Key personnel has been employed in the company for over 8 years on average.

Team

We offer long-term partnerships based on keeping our words, fillfilling all obligations and hight quality of services provided.  

Relationships

We possess own resources including disign center, start-up and commissioning division, tools, technologies and personell.

This allows to execute full cycle EPC projects (from feasibility study to commissioning).

Resources
 

Commissioned facilities experience has allowed us to build market reputation of company that enjoys respect both partners and competitors and trust of customers. 

 

Created over the years excellent reputation is out second best asset. 

Reputation

Latest construction and design technologies (BIM, energy efficient technologies) allow to cut costs, decrease construction duration, increase construction quality and lower maintenance expences.

Technologies

Our work is based on the priceless of business ethics, long-term market presence and high quality of services.

Key parameters of business success today  are not only knowledge, experience and discipline but also honesty, responsibility and consistent high quality services. 

Principles

 

LATEST NEWS

Награждение Злобина А.П.jpg

ENERGY SOLUTIONS EMPLOYEE IS AWARDED A MONGOLIAN MINISTRY OF ENERGY AWARD

23 October 2020

For hard work and great personal contribution in the course of technical modernisation of turbine shop TPP-4  Ulan-Bator project, the head of assembly department of Energy Solutions Andrei Zlobin

was awarded the highest award of the Ministry of Energy of Mongolia.

Andrei Zlobin is  "Honoured power engineer of Mongolia" now.

 

Energy Solution's team congratulates Andrei with excellent work and this well-deserved award!

ТЭЦ-4 1.jpeg

ANOTHER STAGE OF TPP-4 ULAANBATOR MODERNISATION NEARING COMPLETION

15 October 2020

Energy Solutions is nearing completion of construction and installation works of TPP-4 Ulaanbator modernisation project.
Following equipment installation is complete: generator ТВФ -125-2У3, heat and mechanical auxiliary equipment , transformer 160 MVA  110 kV, relay protection and instrumentation systems, conductors, power and control cable system.
Both Russian and Mongolian governments emphesis importance of TPP-4 modernisation. 
14.09.2020 Mongolian Energy minister N.Tavibech Russian ambassador in Mongolia K.Azizov 
visited the construction site and met with our personnel.
Energy Solutions has confirmed to finish project execution in time.

Siemens ES Agreement.jpg

ENERGY SOLUTIONS AND SIEMENS OIL, GAS AND ENERGY DEVELOP COOPERATION

07 August 2020

JSC "Energy Solutions" and Siemens Oil, Gas and Energy Ltd. » signed Memorandum of understanding.

The parties intend to look into a possibility of mutually beneficial cooparation and  joint project development and execution of EPC construction of gas, steam and thermal power powerplants of smaller capacity for industrial enterprises. 

 

The companies intend to conduct joint market research as well as potential projects and customers.  

Energy Solutions has an extensive experience of executing EPC projects in Russian power generation market as well as international experience of executing power generation projects with Russian know hows. 

TPP4 01072020.jpeg

ANOTHER STAGE OF TPP-4 ULAANBATOR MODERNISATION IS FINISHED

01 July 2020

Energy Solutions is nearing completion of another stage of construction and installation works of TPP-4 Ulaanbator modernisation project.  Installation of generator ТВФ -125-2У3 produced by ELSIB, heat and mechanical auxiliary equipment and transformer 160 MVA  110 kV is complete.  

Currently conductors, relay protection, erection and instrumentation systems, electrical technical equipment, power and control cables installation works are under way. Turbine unit 3 dismantling process has began. 

Considering COVID-19 pandemic all works are being performed with strict accordance with medical norm and protocols of Mongolian Ministry of health. 

Screenshot 2020-05-25 at 13.12.36.png

ENERGY SOLUTIONS CONTINUES WORKING ON ALL UNDERGOING PROJECTS

18 May 2020

Dear friends and colleauges! 

Energy Solutions' team has not missed one single work day since self-isolation period started. 

For almost 2 months the general quarantine policy in Russia has been declared. Many companies have stopped working.  We work in the industry that can't stop working. Energy cannot self-isolate and go into quarantine.

We at Energy Solutions continue to work as usual. All ongoing projects continue to be carried out, administrative staff works in the office (when necessary) and remotely (where conditions allow without compromising work process). Our teams of employees continue to work at construction sites with approvals of local authorities and observing all necessary precautions. There are some changes – many internal meetings and some meetings with customers are held virtually now but our office in Moscow is functioning, key personnel is working as usual and all obligations of under ongoing contracts are being fulfilled as planned. Our customers are part of the fuel and energy complex of Russia and Mongolia meaning they will continue to work in any conditions to supply our society with electricity and heat.  

  

COVID-19 and the quarantine besides being a tragedy is also  the strength test. We are proudly passing this test by fulfilling all obligations and prove our excellent reputation once more. 

Thank you for your trust!

SERG0249_edited.jpg

ANOTHER STAGE OF TPP-4 ULAANBATOR MODERNISATION IS FINISHED

09 January 2020

В ходе Технического перевооружения  выполнены следующее виды работ:
- разработка проектной и рабочей документации;
- монтаж деталей турбины ПТ - 80/100;
- монтаж трубопроводов и вспомогательного оборудования (ПВД, насосы);
- монтаж электротехнического оборудования , КИПиА, силовых и контрольных кабелей;
Всего в работе было задействовано более 100 специалистов РФ и Монголии .
Работа АО "Энергетические решения" получила высокую оценку со стороны Заказчика - ТЭЦ-4
В настоящее время в компании(?) ведется подготовка к выполнению  следующего этапа работ - Техническому перевооружению ТА Ст.№2 и СТ.№3

Бизнес Рукопожатие

ENERGY SOLUTIONS AND TECHNOSERV A/C SIGNED STRATEGICAL PARTNERSHIP AGREEMET

08 November 2019

JSC " Energy solutions "and JSC" Technoserv A/S " signed a strategic partnership. The agreement set framework for

 

establishment of a long-term partnership for development, sales and services provided by the parties for power generation

and electrical grid facilities new construction for energy, metallurgical, oil and gas, machine-building, chemical and agricultural industries.

Long-term cooperation will help both companies provide more competitive services and strengthen their market positions.

SERG0088.jpg

NEW TURBINE UNIT OF TPP-4 ULAANBATOR COMMISSIONED

02 September 2019

All works of turbine unit 4 TPP-4 Ulaanbator modernisation project have been completed.

Energy Solutions team completed installation and start-up of main and auxiliary energy equipment and piping of T-100/110 turbine manufactured by Ural Turbine Plant. 02 September 2019 during a ceremony t-123 turbine was commissioned andput into operation. Alexei Gordeev and Ulzisaikhani Enkhtuvshin, the Vice-Presidents of Russian-Mongolian goverment commission for economic and technical development, put the turbine unit into operation.

All works were executed in time and according to the requirements. We thank the customer for rusting us and providing such an opportunity!

ТА4.jpeg

STEAM PIPING DISMANTLING OF TURBINE UNIT 1 OF TPP-4 ULAANBATOR MODERNISATION COMPLETED

29 November 2018

 

Steam piping dismantling of turbine unit 1 completed as a part of TPP-4 ULAANBATOR technical modernisation. 

New steam piping installation works are under way. 

Кольская ГМК3 5.jpeg

RECTIFYING SUBSTATION FOR NORILSK NICKEL COMMISSIONED

15 November 2018

A new rectifying substation of nickel electrolysis shop was commissioned at Kolskaya GMK (a part of Norilsk Nickel Group) at Monchegorsk. The new substation will help increase annual nickel extraction to 145 000 ton. Energy Solutions executed development and supply of this unique equipment as well as provided installation supervision, start-up and commissioning.

All works were don in time and in strict accordance with the requirements.

 

 We thank Kolskaya GMK for trusting us and  are glad to have one more success in our project portfolio! 

IMG_1175.jpeg

ENERGY SOLUTIONS PARTICIPATING IN RUSSIA-UZBEKISTAN COOPERATION FORUM 

17-20 October 2018

Uzbekistan has recently started developing energy projects. To attract Russia energy companies to the local market a Cooperation Forum was organized in Tashkent, Uzbekistan, visited by both countries' presidents.
Energy Solution was invited to participate in the for. The meetings with country's minister of economy B.Khodjaev, the head of the chamber of commerce A. Ikramov took place. 

Resulting from participating in the forum Energy Solutions was invited to participate in the development of power generation projects in Uzbekistan.

IMG_9669.JPG

22 November 2019

Energy Solutions is nearing completion of main and auxiliary equipment installation of turbine unit 1 TPP-4 Ulaanbator.  
Currently installation work of piping, pump systems, power and control cables, electrical units 0,4 kV and conductors

have been  completed.

Currently start-up works are under way. 

День Энергетика.jpeg

HAPPY ENERGY DAY!

22 December 2019

Dear friends and colleagues!

Congratulations with Energy Day! Thank you for another year full of work, success and great results! On the day of our professional holiday we wish you good luck in implementing all plans, finding reliable business partners and inexhaustible electrical, thermal and vital energy supply!

The team of JSC " Energy Solutions»

 

KEY CUSTOMERS

 
Монтаж_3.jpeg

KEY PROJECTS

 
ТМХ1.jpg

DESIGN AND CONSTRUCTION OF TEST STENDS FOR DIESEL GENERATION ENGINES

2018 - current

Customer:

TRANSMASHHOLDING GROUP

 

Works:

Design and construction of 8 test unit for testing and commissioning of diesel-generating engines

SERG0088.jpg

TPP-130 MW ULAANBATOR MODERNIZATION

2018 - current

Customer

TPP-4 Ulaanbator (Mongolia)

Works:

Basic and detailed engineering design, start-up and commissioning

Волга ТЭС 7МВт.jpeg

EPC CONSTRUCTION TPP 7 MW

2016-2018

Customer:

JSC VOLGA

Works:

7 MW TPP construction (Siemens SST-100)

ponceport.jpg

DIESEL-GENERATOR UNIT POWER PLANT 10 MW

2017-2019

Customer:

Sea port Taressa

(Republic of Guinea)

 

 

Works:

Engineering design of 10 MW diesel-generator power planting power supply  

6506353_original.jpeg

NIKEL PRODUCTION OUTPUT 

2018

Customer:

OJSC «GMK Norilsk Nickel»

Works:

Rectifying unit  520 V, 25 кА supply

Нерюнгри Металлик.png

TPP 16 MW CONSTRUCTION MANAGEMENT

2015-2018

Customer:

NORDGOLD S.E. GROUP

Works:

Detailed design,

construction management (ЕРСМ),

infrastructure communication construction .

Турбогенератор ТЭЦ НЛМК.jpg

TURBINE GENERATOR UNIT UPGRADE 60 MW

2015-2018

Customer:

OJSC "NLMK"

Works:

Basic and detailed design,

пequipment and automation system supply.

01.jpg

HEAT SUPPLY SYSTEM OF CITIES 

SHAGONAR AND AK_DOVURAK


2014-2016

Customer:

Fuel and Energy Ministry

Republic of Tyva (Russia)

 

Works:

Basic and detailed design of two boiler plants, main equipment supply

Монголия.jpg

TPP-4 130 MW MODERNIZATION

2013-2015

Customer:

TPP-4 Ulaanbator  (Mongolia)

Works:

Start-up and commissioning

Новогорьковская ТЭЦ.jpg

CCCP 300 MW MODERNIZATION (EXPANSION)

2012-2015

Customer:

OJSC «Т+»

(Novogorkovskatya TPP)

Works:

Construction management (ЕРСМ) of new power unit 350 МВ,

start-up and commissioning

Новое фото УТЭЦ НЛМК 123.jpeg

BLAST-FURNACE CHP 150 MN CONSTRUCTION

2011-2012

Customer:

OJSC «NLMK»

Works:

Start-up and commissioning

%25D0%2590%25D1%2580%25D1%2585%25D0%25B0%25D0%25BD%25D0%25B3%25D0%25B5%25D0%25BB%25D1%258C%25D1%2581

TPP-1 MODERNIZATION

2011-2012

Customer:

JSC «Archaengel Pulp and Paper Plant»

Состав работ:

Basic and detailed design

CONTACTS

JSC "Energy Solutions"

Russia, 117342, Moscow

Butlerova st, building 17,  Block B, 6th floor

Office Center Neo Geo

+7 (495) 134-20-41

 

©2020 Energy Solutions